Phase 2 (The Arc)

Scheme Summary: 44 two bedroom apartments
Site Status: Construction Completed

Construction of Kidlington Phase 2 (The Arc) has now been completed and the property is fully occupied.

The property in its entirety has been transferred to the Company’s residential investment  arm, Blackridge Estates.

The property is now occupied in its entirely by students at Leading Edge Aviation, a locally based flight school, where the Leading Edge have a lease on the entire building for a period of 5 years with an option to extend to 10 years.

Architects: Coleman Hicks
Planning Consultants: Edgars Ltd
Contractors: Tompkins Construction Ltd
Engineers: Stantec

 

SRA 3
Kidlington 1
Kidlington 2
IMG_4232
IMG_4234